Uncategorized

National Energy Conservation Awards 2010_Questionnaire for Municipality

NATIONAL ENERGY CONSERVATION AWARD – 2010

Municipality

Award for Excellence in Energy Conservation and Management

OBJECTIVE

The objective of the scheme is to give national recognition to the management of municipalities who have made systematic and serious attempts for efficient utilization and conservation of energy during the years 2008 -09 and 2009 -10.

THE AWARDS

First and second prizes are proposed to be given to the management of nominated municipality in the form of a Silver Plaque with appropriate citation on such awards as may be decided by the Ministry of Power. The performance of the nominated municipality would be judged through a questionnaire (format enclosed) which would be evaluated by an Award Committee.

The Municipality getting the First Position for the third year in a row will be eligible for a “Top Rank Award” for that year. The Municipality eligible for Top Rank Award for 3rd year in a row would be given the highest prize, namely “Excellence Award” (Instead of Top Rank Award) in recognition of its consistent performance.

.

ELIGIBILITY

The scheme is open to all Municipalities

Criteria for Judging Merit

a) Evaluation of the nominations will be done in two phases, based on the Evaluation and Weight age criteria as given in Annexure-A

b) In the first phase, evaluation will be made on the basis of the preliminary information, as required in Part – I and the best 10% of the participating municipalities (subject to minimum of 4 municipalities) from each sector would be short listed.

c) These shortlisted municipalities would then have to submit the details of the savings made and the projects implemented, as required in Part-II within 8 days from the date of intimation by BEE.

d) The members of the Award Committee or their nominees may visit participating municipalities for verification of data supplied, if felt necessary and it will be obligatory on the part of the participating municipalities to provide necessary
co-operation. The municipalities have to bear all the expenditure in this connection.

e) The Committee’s decision would be final and no appeal would be entertained.

Instructions for Filling up the ‘Award Questionnaire’

a) The data required for the questionnaire pertains to the accounting years (2008-09, 2009-10. If calendar year is the accounting year, then data should pertain to the years 2008 and 2009)

b) The enclosed questionnaire is only a format and thus information sought should be separately computer printed or neatly typed or to be downloaded from the Bureau’s Website: www.bee-india.nic.in and www.energymanagertraining.com

c) The answers to the questions should be precise and specific and should be

supplied in total compliance with the questionnaire format. The deviations

may lead to improper evaluation or the rejection of the nomination.

d) The information sought under any head should be highlighted under the same and no separate annexure should be attached.

e) Each and every query mentioned in the questionnaire needs to be answered. Even, if answer is ‘NO’ or `NOT APPLICABLE’ the same may be stated, instead of ignoring it.

f) The questionnaire should be filled in by a competent and responsible person of the municipality. He/ she should be fully conversant with the energy terms and units, conversion / multiplying factors etc. The duly filled-in questionnaire should be signed by the Chief Executive of the municipality.

Submission of nomination

The filled in format should reach the office of

Director General

Bureau of Energy Efficiency

4th Floor, Sewa Bhawan

R. K. Puram, New Delhi-110 066

Tel. No.: 011-2617 9699 (5 lines)

Fax No.: 011- 2617 8328, 2617 8352

Latest by 20th October, 2010

Note:

1. The current year’s Questionnaire is a revised version and contains some changes at appropriate places. Therefore, please do not use the last year’s Questionnaire while submitting your application for consideration of Award

2. You may download the Questionnaire from www.bee-india.nic.in & www.energymanagertraining.com.

3. The filled in application can also be e–mailed at awards@beenet.in followed by submission of duly signed hard copy by post at BEE office address.

Part 1 (To be submitted by 20th October 2010)
NATIONAL ENERGY CONSERVATION AWARD – 2010
MUNICIPALITY
“Award Questionnaire”
Note: All Municipal Corporations/Urban Local Bodies are eligible to apply
Sl. No General Description
1 Name of the Municipal Corporation
2 Year of Formation of Municipal Body
3 Complete address of Municipality (including Chief Executive’s name & designation) with telephone, fax nos., E-Mail and Mobile nos.
(All details to be submitted)
4 Name, designation, address, telephone, mobile,fax nos. & E-Mail of responsible person who could be contacted in connection with the application for Award
(All details to be submitted)
5 Description of the Municipality and Connected Load (kW)
General Description 2008 – 09 2009 – 10
i Total Area of Coverage (in Sq. kilometers)
ii Population (in Lakhs)
iii Quantity of drinking water pumped in Million m3 /year
iv Quantity of Sewage Pumped in Million m3 / year
6 Electricity Energy Consumption in the Muncipality
Energy used Units 2008 – 09 2009 – 10
Electrical Consumption
(a) Electricity Purchased Lakh kWh
(b) Self generated Lakh kWh
(c) Total Electricity Consumption (a+b) Lakh kWh
(d) Electricity consumption for street lighting Lakh kWh
(e) Electricity consumption for drinking water pumping Lakh kWh
(f) Electricity consumption for sewage pumping Lakh kWh
(g) Electrical Energy Consumption in Street lightening/total area covered [6 (d) / 5 (i)] Lakh kWh/km2
(h) Electrical Energy Consumption in drinking water pumping / Quantity of water supplied /area of coverage
[{6 (e) / 5 (iii)} / 5 (i)]
Lakh kWh / millon m3/km2
(i) Electrical Energy Consumption in Sewage pumping / Quantity of sewage pumped /area of coverage [{6 (f) / 5 (iv) } / 5 (i)] Lakh kWh/millon m3/km2
7 Achievement of energy savings from implementation of new Energy Efficiency Projects during the year 2009-10 (The energy savings achieved shall only the projects which have been implemented during 2009-10)
(a) Year Annual Electricity Savings
(Lakh kWh)
Any Other
2009-10
(b) Year Annual Energy Savings in
Rs. Lakhs
One time investment in
Rs. Lakhs
2009-10
8 Summary
Please summarize the information and data provided in this questionnaire as per the format given below:
NATIONAL ENERGY CONSERVATION AWARD –2010
MUNCIPALITY
SUMMARY SHEET

Unit Name ………………………………………………………………..

8a. Specific Energy Consumption (SEC) Reduction during the period 2008 – 2010
(S.No. 6)
Year Electrical Energy Consumption in Sewage pumping / Quantity of sewage pumped /area of coverage (Lakh kWh/millon m3/km2) % Reduction over
2008 – 2009
Electrical Energy Consumption in Street lightening/total area covered (lakh kWh/km2) % Reduction over
2008 – 2009
Electrical Energy Consumption in drinking water pumping / Quantity of water supplied /area of coverage (Lakh kWh/millon m3/km2) % Reduction over
2008 – 2009
2008 – 2009
2009 – 2010
8b. Absolute Savings
Elect. Saving (Lakh kWh) in
2009-10
Elect.Consumption (Lakh kWh) in
2008-09
% Elect.Saving (savings achieved/ electricity consumption of previous year)
(i) (ii) (i) / (ii) x 100
I, ………………….. Solemnly declare that to the best of my knowledge the information given in the Award Questionnaire (National Energy Conservation Award-2010) thereto is correct and complete.
(Signature of the Chief Executive)
Name & designation of the
Chief Executive……………………………..…
Mobile No. ………………………………
Date:
Place: Organization Seal …………………………
PART-II (To be submitted after intimation by BEE)
NATIONAL ENERGY CONSERVATION AWARD – 2010
(MUNICIPALITY)
“Award Questionnaire”
1 Name of the Municipality
2 The Sector* to which unit’s nomination should be considered
3 Complete address of Municipality location
(including Chief Executive’s name & designation)
with mobile,telephone,fax nos. & e-mail
4 Name, designation, address, mobile, telephone, fax nos. & e-mail of responsible person who could be contacted in connection with the application for Award
5 Please provide details in the following format on major energy efficiency improvement projects/ measures including in-house R&D efforts, technology innovation, energy substitution and renewable energy systems commissioned during the year 2009-2010 giving energy savings achieved. (please also fill-up the Part II – Annexure for the Energy Conservation Measures implemented during the year 2009-2010).
Year of Commissioning of the projects Project description Achievement of Annual energy savings in 2009-10 Investment incurred on the project Rs. Lakhs)
Electricity Total savings in (Rs. Lakhs)
(Lakhs kWh)
(i) Please list the projects title names which were implemented during the year (ii) Please mention the achievement of energy saving against each projects in the suitable columns.
2009-2010
* Delete or add fuels as the case may be
I, ………………….. Solemnly declare that to the best of my knowledge the information given in the Award Questionnaire (National Energy Conservation Award-2010) thereto is correct and complete.
(Signature of the Chief Executive)
Date:
Place: Name & designation of the Chief Executive ………………………………
Mobile No. ………………………………………
Organisation Seal ………………………………………
DOCUMENTS ATTACHED:
1. Copies of Certificate pertaining to statutory requirements such as safety and pollution control for the period 2009-10 are enclosed.
2. A brief write up of the unit (not more than 3-4 pages) along with photographs depicting equipment / locations where energy efficiency activities have been undertaken and a CD containing the same is attached (Sample writeup may be seen at www.bee-india.nic.in)
Note: The Part-II and Part-II-Annexure to be kept ready and to be dispatched immediately after the intimation sent by BEE
Annexure – A
NATIONAL ENERGY CONSERVATION AWARD – 2010
Evaluation criteria -MUNICIPALITY
S. No. ITEM Max 50 marks
1 ENERGY SAVINGS
i Electrical Energy savings in lakh kWh for 2009-10
% savings in EE over the previous year (2008-09) (10 marks)
2 SPECIFIC ENERGY CONSUMPTION REDUCTION
i Specific Electrical Energy Consumption in street lighting (kWh/km2 street lighted)
% SEC reduction during 2009-10 over 2008-09 (10 marks)
ii Specific Electrical Energy Consumption in drinking water pumping (kWh/million m3/ km2)
% SEC reduction during 2009-10 over 2008-09 (10 marks)
iii Specific Electrical Energy Consumption in sewage pumping (kWh/million m3/ km2)
% SEC reduction during 2009-10 over 2008-09 (10 marks)
3 Specific Energy Consumption Comparisons with the best reported values among the participating units (10 marks)
NOTE:1. The above evaluation and weightage criteria is common for all the municipalities. If due to some peculiar characteristics of the participating municipality, the application of the above criteria may not be feasible.Therefore, Award Committee reserves the right to modify the criteria, which shall be uniformly applied to all the municipalities.
2. The municipalities having negative specific energy consumption shall not be
considered for the award
3. For those particular units, where it is not feasible to compare SEC with best reported
value, 50% of the weightge may be merged with S.No.-2 and the balance 50% with S.No.-1
4. For all the evaluation criteria, if the difference between the first and second unit in the particular criteria is more than 10% in the percentage score, then the second best unit will be awarded 20% less marks than that of the first unit and prorate will start from that unit onward. Similarly, if the difference between second and third unit is also found to be more than 10% the above methodology will be followed till the completion of the evaluation criteria of all the units

Part-II-Annexure

(To be submitted along with Part –II after intimation by BEE)

Energy Conservation Measure implemented in 2009-10

(To be filled up separately for each Energy Conservation Measure implemented)

ID to be filled by BEE

Title of the measure

Sector: Municipality

Year : 2009-10

Technology ………………

Description of the energy conservation measure:

Picture/ sketch/ drawing before modification

(if available)

Picture/ sketch/ drawing after modification

Agency that executed the project (with complete address and email):

Total investment, Rs.

Year of implementation:

First year energy cost savings, Rs.

First year other savings, Rs.

On annual basis

kWh

Coal

(Tonnes)

Gas

Nm3

Oil

(kL)

Other

Energy consumption before

Energy consumption after

Energy tariff, Rs/ kWh/ Tonnes/ Nm3/ kL …

Office Building complete address:

Contact person who could be contacted for more information:

We authorise Bureau to use this information for dissemination

Signature

Date

Note: Please submit this sheet separately for each Energy Conservation Measure implemented in 2009-10 and a CD containing the above information may be enclosed.